The aim of this qualification is to recognise the knowledge, skills and competence demonstrated by an individual in the workplace. This Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services ‐ Construction Operations ‐ Laying Kerbs and Channels provides the opportunity for individuals who specialise in laying kerbs and channels to demonstrate their competence. The units in this qualification are derived from National Occupational Standards.

The Rule of Combination (RoC) below specifies the combination of units that need to be achieved for the individual to be awarded the qualification.

Mandatory Units

  • Conforming to General Health, Safety and Welfare in the Workplace.

    A/503/1170

    Comply with all workplace health, safety and welfare legislation requirements., Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures., Comply with organisational policies and procedures to contribute to health, safety and welfare., Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area., Comply with and support all organisational security arrangements and approved procedures.

  • Laying Kerbs and Channels in the Workplace

    D/503/9634

    Interpret the given information relating to the work and resources when laying kerbs and channels., Know how to comply with relevant legislation and official guidance when laying kerbs and channels., Maintain safe and healthy working practices when laying kerbs and channels., Select the required quantity and quality of resources for the methods of work to lay kerbs and channels., Minimise the risk of damage to the work and surrounding area when laying kerbs and channels., Complete the work within the allocated time when laying kerbs and channels., Comply with the given contract information to lay kerbs and channels to the required specification.

  • Conforming to Productive Working Practices in the Workplace

    J/503/1169

    Communicate with others to establish productive work practices., Follow organisational procedures to plan the sequence of work., Maintain relevant records in accordance with the organisational procedures., Maintain good working relationships when conforming to productive working practices.

  • Setting Out Secondary Dimensional Work Control in the Workplace

    L/600/8101

    Interpret the given information relating to setting out dimensional control of the work., Know how to comply with relevant legislation and official guidance to set out dimensional control of the work., Maintain safe working practices when setting out dimensional control of the work., Select the required quantity and quality of resources to set out dimensional control of the work., Minimise the risk of damage to the work and surrounding area when setting out dimensional control of the work., Complete the work within the allocated time when setting out dimensional control of the work., Comply with the given contract information to set out dimensional control of the work to the required specification.

Optional Units

  • Preparing and Operating Forward Tipping Dumpers to Receive, Transport and Discharge Materials in the Workplace

    A/600/7977

    Interpret the given information relating to the use of forward tipping dumpers to carry out transporting and discharging operations., Organise with others the sequence and operation in which transporting and discharging operations using forward tipping dumpers are to be carried out., Know how to comply with relevant legislation and official guidance to carry out transporting and discharging operations with forward tipping dumpers., Maintain safe working practices when preparing for and carrying out transporting and discharging operations using forward tipping dumpers., Request and select the required quantity and quality of resources to prepare for and carry out transporting and discharging operations using forward tipping dumpers., Minimise the risk of damage to the work and surrounding area when transporting and discharging materials using forward tipping dumpers., Complete the work within the allocated time when preparing to and transporting and discharging materials using forward tipping dumpers., Comply with the given contract information to receive, transport and discharge materials using forward tipping dumpers to the required specification.

  • Preparing and Operating Specialised Powered Tools and Equipment in the Workplace

    D/600/8099

    Interpret the given information relating to the preparation and use of powered tools and/or equipment., Know how to comply with relevant legislation and official guidance to prepare and use powered tools and/or equipment., Maintain safe working practices when preparing for and using powered tools and/or equipment., Request and select the required quantity and quality of resources to prepare for sustain powered tools and/or equipment., Minimise the risk of damage to the work and surrounding area when using powered tools and/or equipment., Carry out-pre-use preparation inspections on powered tools and/or equipment in accordance with given procedures., Operate powered tools and/or equipment in accordance with safe working practices to achieve the working outcome.

  • Erecting and Dismantling Access/Working Platforms in the Workplace

    D/600/8281

    Interpret the given information relating to the work and resources when erecting and dismantling access/working platforms., Know how to comply with relevant legislation and official guidance when erecting and dismantling access/working platforms., Maintain safe working practices when erecting and dismantling access/working platforms., Select the required quantity and quality of resources for the methods of work to erect and dismantle access/working platforms., Minimise the risk of damage to the work and surrounding area when erecting and dismantling access/working platforms., Complete the work within the allocated time when erecting and dismantling access/working platforms., Comply with the given contract information to erect and dismantle access/ working platforms to the required specification.

  • Reinstating Excavation and Highway Surfaces in the Workplace

    H/503/9442

    Interpret the given information relating to the work and resources when reinstating excavation and highway surfaces., Know how to comply with relevant legislation and official guidance when reinstating excavation and highway surfaces., Maintain safe and healthy working practices when reinstating excavation and highway surfaces., Select the required quantity and quality of resources for the methods of work to reinstate excavation and highway surfaces., Minimise the risk of damage to the work and surrounding area when reinstating excavation and highway surfaces., Complete the work within the allocated time when reinstating excavation and highway surfaces., Comply with the given contract information to reinstate excavation and highway surfaces to the required specification.

  • Preparing and Mixing Concrete and Mortars in the Workplace

    K/503/9457

    Know how to comply with relevant legislation and official guidance when preparing and mixing concrete and mortars., Maintain safe and healthy working practices when preparing and mixing concrete and mortars., Select the required quantity and quality of resources for the methods of work to prepare and mix concrete and mortars., Minimise the risk of damage to the work and surrounding area when preparing and mixing concrete and mortars., Complete the work within the allocated time when preparing and mixing concrete and mortars., Comply with the given contract information to prepare and mix concrete and mortars to the required specification.

  • Segregating the Area for Highways Works in the Workplace

    K/503/9622

    Interpret the given information relating to the work and resources when segregating the area for highways works., Know how to comply with relevant legislation and official guidance when segregating the area for highways works., Maintain safe and healthy working practices when segregating the area for highways works., Select the required quantity and quality of resources for the methods of work to segregate the area for highways works., Minimise the risk of damage to the work and surrounding area when segregating the area for highways works., Complete the work within the allocated time when segregating the area for highways works., Comply with the given contract information to segregating the area for highways works to the required specification.

  • Providing Temporary Excavation Support in the Workplace

    K/503/9636

    Interpret the given information relating to the work and resources when providing temporary excavation support., Know how to comply with relevant legislation and official guidance when providing temporary excavation support., Maintain safe and healthy working practices when providing temporary excavation support., Select the required quantity and quality of resources for the methods of work to provide temporary excavation support., Minimise the risk of damage to the work and surrounding area when providing temporary excavation support., Complete the work within the allocated time when providing temporary excavation support., Comply with the given contract information to provide temporary excavation support to the required specification.

  • Preparing and Operating Ride-on Rollers to Compact Materials in the Workplace

    K/600/8073

    Interpret the given information relating to the use of ride-on rollers to carry out compacting operations., Organise with others the sequence and operation in which compacting operations using ride-on rollers are to be carried out., Know how to comply with relevant legislation and official guidance to carry out compacting operations with ride-on rollers., Maintain safe working practices when preparing for and carrying out compacting operations using ride-on rollers., Request and select the required quantity and quality of resources to prepare for and carry out compacting operations using ride-on rollers., Minimise the risk of damage to the work and surrounding area when compacting materials using ride-on rollers., Complete the work within the allocated time when preparing to and compacting materials using ride-on rollers., Comply with the given contract information to compact materials using ride-on rollers to the required specification.

  • Preparing to and Directing and Guiding Plant and Plant Operations in the Workplace

    K/600/8087

    Interpret the given information relating to the preparation for, and directing and guiding plant., Organise with others the sequence and operation in which directing and guiding plant is to be carried out., Know how to comply with relevant legislation and official guidance to direct and guide plant., Maintain safe working practices when preparing for, directing and guiding plant., Select the required quantity and quality of resources to prepare for, and when directing and guiding plant., Minimise the risk of damage to the work and surrounding area when directing and guiding plant., Complete the work within the allocated time when preparing to, and directing and guiding plant., Comply with the given contract information to prepare to, and direct and guide plant using to the required specification.

  • Installing Street Ironwork in the Workplace

    M/503/9623

    Interpret the given information relating to the work and resources when installing street ironwork., Know how to comply with relevant legislation and official guidance when installing street ironwork., Maintain safe and healthy working practices when installing street ironwork., Select the required quantity and quality of resources for the methods of work to install street ironwork., Minimise the risk of damage to the work and surrounding area when installing street ironwork., Complete the work within the allocated time when installing street ironwork., Comply with the given contract information to install street ironwork to the required specification.

  • Preparing for, and Arranging and Securing Plant for Haulage in the Workplace

    M/600/8091

    Interpret the given information relating to the preparation of, and the arranging and securing of plant for haulage., Know how to comply with relevant legislation and official guidance to carry out the arranging and securing of plant for haulage., Maintain safe working practices when preparing for and arranging and securing plant for haulage., Select the required quantity and quality of resources to prepare for, and when arranging and securing plant for haulage., Minimise the risk of damage to the work and surrounding area when arranging and securing plant for haulage., Complete the work within the allocated time when preparing to, and arranging and securing plant for haulage., Comply with the given contract information to prepare to, and arrange and secure plant for haulage to the required specification.

  • Establishing Work Area Protection and Safety in the Workplace

    R/600/7127

    Interpret the given information relating to the work and resources when establishing work area protection and safety., Know how to comply with relevant legislation and official guidance when establishing work area protection and safety., Maintain safe working practices when establishing work area protection and safety., Select the required quantity and quality of resources for the methods of work to establish work area protection and safety., Minimise the risk of damage to the work and surrounding area when establishing work area protection and safety., Complete the work within the allocated time when establishing work area protection and safety., Comply with the given contract information to establish work area protection and safety to the required specification

  • Slinging and Signalling the Movement of Loads in the Workplace

    R/600/8102

    Interpret the given information relating to the preparation for and the slinging and signalling of loads., Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out., Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads., Maintain safe working practices when preparing for and slinging and signalling loads., Select the required quantity and quality of resources to prepare for and when slinging and signalling loads., Minimise the risk of damage to the work and surrounding area when slinging and signalling loads., Complete the work within the allocated time when preparing to and slinging and signalling loads., Comply with the given contract information to prepare to and sling and signal loads for movement to the required specification.

  • Placing and Compacting Concrete in the Workplace

    Y/600/8165

    Interpret the given information relating to the work and resources when placing and compacting concrete., Know how to comply with relevant legislation and official guidance when placing and compacting concrete., Maintain safe working practices when placing and compacting concrete., Select the required quantity and quality of resources for the methods of work to place and compact concrete., Minimise the risk of damage to the work and surrounding area when placing and compacting concrete., Complete the work within the allocated time when placing and compacting concrete., Comply with the given contract information to place and compact concrete to the required specification.

Check price and availability

  • A member of our training team will contact you with course details, locations and prices.